BB&T



BB&T



When the tenant complaints and energy cost got out of hand at the Martinsburg, WV office, BB&T turned to Chesapeake Controls to perform a complete building analysis and from that created scope of work and budget. The resulting project included:

  • Install new high efficiency hot water boilers
  • Install VFD on the main VAV air handling unit
  • Replace 3-way pneumatic hot water valves with new 2-way, electric
  • Implement a variable hot water pumping system
  • New chemical feed system
  • Refurbishment of the cooling tower
  • Install a new Honeywell web-based DDC control system with touchscreen interface and remote access via cellular modem